Built Projects

M/s KCKV Consultants Pvt. Ltd. and M/s Amtech Engineers - proprietor Mr. Arun Kumar Bhowmik, a leading & experienced contractor and developer have formed this DESIGN BUILD COMPANY which has a staff strength of around 50 people. It has adequate machinery and equipment to execute works from 75 – 100 crores. It provides design, execution and building construction services to our clients. This combines design and construction under one roof, allowing us to manage every aspect of project from concept to completion. Unlike traditional construction, where separate entities handle design and building, Design-Build offers single-source accountability, ensuring smooth collaboration, enhanced quality, and timely delivery. With this integrated method, we bring expertise, transparency, and cost savings to every project, making the journey from idea to reality more efficient and hassle-free for our clients.

As Design Build company, we have successfully completed projects throughout the country.

EKKAA ELECTRONICS PVT.LTD AT SECTOR -81, NOIDA ,UTTAR PRADESH

  • Project Name: EKKAA ELECTRONICS PVT.LTD, SECTOR-81, NOIDA,(U.P)
  • Contractor: M/s KCKV Consultants Pvt. Ltd. & M/s Amtech Engineers
  • Project Cost: 6000 Lakhs
  • Project Duration: April 2022- March 2024
Image

EKKAA ELECTRONICS PVT.LTD

Image

EKKAA ELECTRONICS PVT.LTD

Image

EKKAA ELECTRONICS PVT.LTD

Image

EKKAA ELECTRONICS PVT.LTD

FACTORY BUILDING AT SECTOR-37, GURGAON,HARYANA

  • Project Name: INDUSTRIAL BUILDING AT SECTOR-37 GURGAON
  • Contractor: M/s KCKV Consultants Pvt. Ltd. & M/s Amtech Engineers
  • Project Cost: 300 Lakhs
  • Project Duration: March 2021- August 2022
Factory Building Gurgaon Haryana

FACTORY BUILDING, GURGAON, HARYANA

Factory Building Gurgaon Haryana

FACTORY BUILDING, GURGAON, HARYANA

Factory Building Gurgaon Haryana

FACTORY BUILDING, GURGAON, HARYANA

Premium Residence Gurgaon Haryana

  • Project Name: Premium Residence Gurgaon Haryana
  • Contractor: M/s KCKV Consultants Pvt. Ltd. & M/s Amtech Engineers
  • Project Cost: 700 Lakhs
  • Project Duration: In Progress
Image

592-P Premium Residence Gurgaon Haryana

ASTUTE INTERNATIONAL SCHOOL AT JEWAR

  • Project Name: ASTUTE INTERNATIONAL SCHOOL AT JEWAR
  • Contractor: M/s Amtech Engineers
  • Project Cost: 950 Lakhs
  • Project Duration: March 2015 – Jan 2016
Image

ASTUTE INTERNATIONAL SCHOOL AT JEWAR

BATCH HOUSE AT GOLD PLUS GLASS INDUSTRIES LTD U.P

  • Project Name: BATCH HOUSE AT GOLD PLUS GLASS INDUSTRIES LTD U.P
  • Contractor: M/s Amtech Engineers
  • Project Cost: 1250 Lakhs
  • Project Duration: May 2016 - Feb 2017
Image

BATCH HOUSE AT GOLD PLUS GLASS INDUSTRIES LTD U.P

RAMESH MALL.RMS ENTERPRIES KHURJA ROAD JEWAR GAUTAM BUDDH NAGAR U.P

  • Project Name: RAMESH MALL.RMS ENTERPRIES KHURJA ROAD JEWAR GAUTAM BUDDH NAGAR U.P
  • Contractor: M/s Amtech Engineers
  • Project Cost: 1560 Lakhs
  • Project Duration: April 2018- March 2019
Image

RAMESH MALL.RMS ENTERPRIES KHURJA ROAD JEWAR GAUTAM BUDDH NAGAR U.P

R N ENGINEERING COLLEGE MATLAUDA, PANIPAT

  • Project Name: R N ENGINEERING COLLEGE MATLAUDA, PANIPAT
  • Contractor: M/s Amtech Engineers
  • Project Cost: 821 Lakhs
  • Project Duration: March 2015 – Jan 2016
Image

R N ENGINEERING COLLEGE

Image

R N ENGINEERING COLLEGE

Image

R N ENGINEERING COLLEGE

SUNRAY ENGINEERING WORK

  • Project Name: SUNRAY ENGINEERING WORKS , SECTOR -69, FARIDABAD.
  • Contractor: M/s Amtech Engineers
  • Project Cost: 415 Lakhs
  • Project Duration: August 2018 - Oct 2019
Image

SUNRAY ENGINEERING WORK

GOLD PLUS FLOAT PVT.LTD ROORKEE,U.K

  • Project Name: GOLD PLUS FLOAT PVT.LTD ROORKEE,U.K
  • Contractor: M/s Amtech Engineers
  • Project Cost: 600 Lakhs
  • Project Duration: Jan 2021- Sept 2021
Image

GOLD PLUS FLOAT PVT.LTD ROORKEE,U.K

Office building Yug facilities at Hauzari complex, Noida U.P

  • Project Name: Office building Yug facilities at Hauzari complex, Noida U.P
  • Contractor: M/s Amtech Engineers
Image

Office building Yug facilities at Hauzari complex, Noida U.P

Office / Factory Yug Facilities being used by TATA industries at Sector–58, Noida, Uttar Pradesh

  • Project Name: Office / Factory Yug Facilities being used by TATA industries at Sector–58, Noida, Uttar Pradesh
  • Contractor: M/s Amtech Engineers
Image

Office / Factory Yug Facilities being used by TATA industries at Sector–58, Noida, Uttar Pradesh

We believe in streamlining the construction process through our innovative Design-Build method. This approach combines design and construction under one roof, allowing us to manage every aspect of your project from concept to completion. Unlike traditional construction, where separate entities handle design and building, Design-Build offers single-source accountability, ensuring smooth collaboration, enhanced quality, and timely delivery. With this integrated method, we bring expertise, transparency, and cost savings to every project, making the journey from idea to reality more efficient and hassle-free for our clients.

Image

Design Build Construction

Design Led-Design Build - A better way to build

Design-build construction method is a project delivery method where a single entity, the designer - builder is responsible for design and construction of the project.

THE TRADITIONAL CONSTRUCTION METHOD OF 2 SEPARATE ENTITIES

  • Architect conceptualizes and creates plans.
  • Contractor bids and builds based on plans.

2 separate agencies have two separate contracts having no accountability with each other. Hence, it is very difficult to collaborate, coordinate and maintain the speed and quality of construction leading to finger pointing, poor quality and delays and cost escalations.

Advantages of Design-Build Construction

  1. TEAM/COMPANY WITH CLEAR COMMON GOALS: Responsible from design (start) to finish (construction).
  2. SINGLE SOURCE ACCOUNTABILITY: The project leader is responsible for both design and construction.
  3. CONTINUITY: The architect designer continues as the contractor, ensuring a smooth transition from design to construction.
  4. EXPERTISE: The designer also thinks like a builder, resolving future problems on the drawing board, leading to cost savings for the client.
  5. PROFESSIONALISM: The designer aims to create a high-quality building/product to showcase to other clients, with their reputation at stake.
  6. OWNER'S CONTROL: Discussions and decisions between the owner and designer during the design stage are easily carried into the construction stage, ensuring clarity, smooth collaboration, and transparent budgeting.
  7. TIME SAVINGS: Faster planning, adaptation to changes, responding to client preferences, and material selection saves time during the construction process.
  8. COST SAVINGS: A combined contract with clear construction specifications allows the design-build company to offer lower rates.